VCITA HOME INSPECTION
& Service LLC • Licensed & Insured
CCPIA / ASTM E2018 • Property Condition Assessment

Commercial Property
Condition Assessment

Property Assessed
Treasure Coast Executive Center
4200 Palm Bay Boulevard
Palm Bay, FL, 32905
Building Type
Office Building
Size
NaN sq ft
Floors
4
Year Built
2006
Class
Class A - Premium / Trophy
Prepared for: Coastal Property Investors LLC
Inspector: Calvin S. Johnson • Lic. FL#HI2622
Report # CIR-2026-SAMPLE Date July 16, 2026

Assessment at a Glance

17
Systems Inspected
38
Total Findings
2
Critical / Safety
6
Major / Deficient
17
Minor / Maintenance
12
Positive
Total Estimated Repair & Replacement Costs
All findings with cost estimates aggregated (midpoint of ranges)
$1,343,475
Statistics are auto-calculated from inspection findings. Cost estimates are approximate and intended for budgetary planning only.

Table of Contents

1. Assessment at a Glance
2. Executive Summary
3. Priority Action Items
4. Property Information
5. Condition Summary Matrix
6. Roofing Systems
7. Building Envelope & Exterior
8. Structural Systems
9. Electrical Systems
10. Plumbing Systems
11. HVAC & Mechanical Systems
12. Fire & Life Safety
13. Interior Spaces & Finishes
14. ADA Accessibility
15. Parking & Paving
16. Elevators & Conveying Systems
17. Site & Grounds
18. Loading Docks & Warehousing
19. Environmental Observations
20. Signage & Exterior Features
21. Mechanical Systems
22. General Observations & Summary
Compliance Observations Summary
Capital Expenditure & Deferred Maintenance Summary
Remaining Useful Life (RUL) Summary
Building Systems Lifecycle Timeline
Limitations & Disclaimers
Inspector Certification

Executive Summary

Vcita Home Inspection & Service LLC was retained by Coastal Property Investors LLC to perform a Property Condition Assessment (PCA) of the Treasure Coast Executive Center, a 4-story, 68,500 SF Class A office building located at 4200 Palm Bay Boulevard, Palm Bay, Florida 32905. The assessment was conducted over three (3) days in accordance with CCPIA Commercial Standards of Practice and consistent with ASTM E2018 guidelines.

Overall Assessment: The subject property is in Good to Fair overall condition for a building of this age and type. The property has been reasonably well maintained with a 2019 lobby renovation. However, several systems are approaching or have reached their expected useful life and will require capital investment within the next 3-5 years to maintain the building's Class A status.

Key Findings Summary:

A detailed breakdown of all findings, cost estimates, and recommended timelines follows in this report. We recommend the property owner prioritize the critical safety items within 30 days and develop a 5-year capital improvement plan for the remaining items.

Priority Action Items

2
Critical / Safety
6
Major / Deficient
8
Total Priority Items
# Severity System Finding Recommendation Est. Cost
1 Critical Electrical Systems ATS Transfer Switch Failure
The ASCO automatic transfer switch failed to transfer from utility to generator power during testing. The building will ...
IMMEDIATE: Engage licensed electrical contractor to diagnose and repair or replace the ATS. This is ... $15,000 - $22,000
2 Critical Fire & Life Safety Fire Alarm Panel - Zone 7 Fault
The Notifier NFS2-3030 fire alarm panel is displaying a persistent trouble condition on Zone 7 (4th floor northeast wing...
IMMEDIATE: Dispatch fire alarm service contractor to diagnose and repair Zone 7 fault within 72 hour... $2,500 - $5,000
3 Major Roofing Systems TPO Membrane - End of Useful Life
The original 2006 TPO roof membrane has reached the end of its expected 20-year service life. Multiple areas show UV deg...
Full roof replacement with new 60-mil TPO or PVC membrane system recommended within 12-18 months. Co... $145,000 - $185,000
4 Major HVAC & Mechanical Systems RTU #3 Compressor Failure
RTU #3 (15-ton, serving common areas and lobby) has one of two compressors failed and is operating at 50% capacity. The ...
Replace RTU #3 with new high-efficiency unit. Given the age of all four RTUs, consider a phased repl... $35,000 - $45,000
5 Major Parking & Paving Main Parking Lot - Alligator Cracking
Approximately 3,500 SF of alligator cracking in the SE quadrant of the main parking lot indicating base failure. Crack s...
Mill and overlay the affected 3,500 SF area with new 2" asphalt after base repair. Consider full lot... $22,000 - $30,000
6 Major Elevators & Conveying Systems Elevator #2 - Hydraulic Seal Leak
Elevator #2 hydraulic cylinder is showing oil seepage at the packing gland seal. Oil containment pan is approximately 40...
Schedule hydraulic cylinder repacking with Schindler under maintenance contract. Install secondary c... $8,000 - $12,000
7 Deficient Fire & Life Safety Stairwell B - Handrail Non-Compliance
Stairwell B handrail terminates abruptly at the 2nd-floor landing without the required code extension. Additionally, the...
Install code-compliant handrail extensions and replace non-conforming baluster section per Florida B... $3,500 - $5,500
8 Repair Needed HVAC & Mechanical Systems RTU #4 High-Pressure Readings
RTU #4 serving IT closets showing elevated head pressure readings suggesting potential condenser coil fouling or refrige...
Schedule condenser coil cleaning and refrigerant charge check. If pressure persists, compressor eval... $1,500 - $3,000
* Cost estimates are approximate and intended for budgetary planning only. Formal bids from licensed contractors are recommended.

Property Information

Property Address4200 Palm Bay Boulevard
City / State / ZipPalm Bay, FL, 32905
Building NameTreasure Coast Executive Center
Building TypeOffice Building
Building ClassClass A - Premium / Trophy
Year Built2006
Total Building Area68,500 sq ft
Number of Floors4
Number of Units32
Occupancy Rate87%
Parking Spaces285
SprinkleredYes
Elevator Count2
ZoningC-2 Commercial
Last Renovation2019 (Lobby & Common Areas)

Condition Summary Matrix

System / Component Condition Rating
Roofing Systems Fair
Building Envelope & Exterior Good
Structural Systems Good
Electrical Systems Fair
Plumbing Systems Good
HVAC & Mechanical Systems Fair
Fire & Life Safety Fair
Interior Spaces & Finishes Good
ADA Accessibility Good
Parking & Paving Fair
Elevators & Conveying Systems Fair
Site & Grounds Good
Loading Docks & Warehousing Good
Environmental Observations Good
Signage & Exterior Features Good
Mechanical Systems Good
General Observations & Summary Good

1. Roofing Systems

Fair
The building features a TPO (Thermoplastic Polyolefin) single-ply membrane roof system installed in 2006 over rigid insulation on a steel deck. The roof area is approximately 17,125 SF. Two (2) Carrier Weathermaster RTU units and associated ductwork penetrate the roof surface. Roof access is via an interior ladder hatch.

☑ Inspection Checklist

8/12
Roof membrane type and condition
Flashings and edge metal
Roof drainage systems (scuppers, drains, gutters)
Roof penetrations and curbs
Skylights and roof hatches
Parapet walls and coping
Ponding water evidence
Roof-mounted equipment pads
Insulation (visible or accessible)
Estimated remaining useful life
Evidence of prior repairs or patches
Roof access and safety features

⚙ Components & Equipment

TPO Membrane Roof System
FAIR
Manufacturer: Carlisle SynTec
Year Installed: 2006
Approx Age: 20 years
Estimated R U L: 0-2 years
Membrane showing UV degradation, multiple patches observed. Seam separation noted in NE quadrant.
Roof Drainage - Internal Drains
GOOD
Year Installed: 2006
Estimated R U L: 15+ years
4 internal drains with secondary overflow scuppers. Some debris accumulation noted.
Metal Flashing & Copings
FAIR
Year Installed: 2006
Estimated R U L: 3-5 years
Aluminum copings showing oxidation. Some fastener back-out observed at parapet wall.

⚠ Findings & Observations

TPO Membrane - End of Useful Life
Major
The original 2006 TPO roof membrane has reached the end of its expected 20-year service life. Multiple areas show UV degradation, surface chalking, and seam separation in the NE quadrant. Several field patches indicate prior leak repairs.
Recommendation: Full roof replacement with new 60-mil TPO or PVC membrane system recommended within 12-18 months. Consider 20-year NDL warranty specification.
Estimated Cost: $145,000 - $185,000
Ponding Water - NW Corner
Minor
Approximately 200 SF area of ponding water observed 48 hours after rainfall in the NW corner near RTU #2.
Recommendation: Install tapered insulation cricket to redirect drainage toward existing roof drains.
Estimated Cost: $3,500 - $5,000
Roof Hatch Seal
Maintenance
Roof access hatch gasket is deteriorated and not sealing properly.
Recommendation: Replace hatch gasket seal. Standard maintenance item.
Estimated Cost: $350 - $500
Roof Condition Acceptable for Age
Positive
Despite reaching end of service life, the roof has been regularly maintained with timely patches, preventing major interior water intrusion.

2. Building Envelope & Exterior

Good
The exterior envelope consists of stucco over CMU block walls with aluminum-framed curtain wall glazing on the first floor and punched window openings on floors 2-4. The 2019 renovation included repainting of the exterior stucco and replacement of first-floor storefront glazing.

☑ Inspection Checklist

7/12
Exterior wall cladding type and condition
Windows and glazing systems
Exterior doors and hardware
Sealants and caulking
Expansion joints
Masonry / CMU block condition
Stucco or EIFS condition
Metal panel systems
Moisture intrusion indicators
Loading dock doors and seals
Exterior lighting
Awnings and canopies

⚙ Components & Equipment

Stucco Wall System
GOOD
Year Installed: 2006
Estimated R U L: 15+ years
Recently repainted (2019). Minor hairline cracking at control joints - cosmetic only.
Aluminum Curtain Wall - 1st Floor
EXCELLENT
Year Installed: 2019
Estimated R U L: 20+ years
Replaced during 2019 renovation. No defects observed.
Window Systems - Floors 2-4
GOOD
Year Installed: 2006
Estimated R U L: 10-15 years
Insulated glass units. Two (2) units with failed seals noted on 3rd floor east.
Exterior Caulking & Sealants
FAIR
Year Installed: 2019
Estimated R U L: 3-5 years
Sealant at window perimeters showing early UV degradation on south exposure.

⚠ Findings & Observations

Failed IGU Seals - 3rd Floor East
Minor
Two insulated glass units (IGU) on the 3rd floor east elevation show condensation between panes, indicating seal failure.
Recommendation: Replace the two affected IGU units. Monitor adjacent units for similar failure.
Estimated Cost: $2,200 - $3,000
Exterior Sealant Maintenance
Maintenance
South-facing window perimeter sealants showing early UV degradation. Not yet compromised but should be addressed proactively.
Recommendation: Schedule comprehensive sealant replacement on south and west exposures within 2-3 years.
Estimated Cost: $8,000 - $12,000
2019 Renovation - Excellent Condition
Positive
The 2019 lobby and first-floor storefront renovation is in excellent condition with no defects observed. Modern low-E glazing improves energy efficiency.

3. Structural Systems

Good
The building is a 4-story steel-framed structure with reinforced concrete foundations, steel columns and beams, composite metal deck with concrete topping, and CMU block exterior walls. Foundation type is spread footings with grade beams per available construction documents.

☑ Inspection Checklist

9/11
Foundation type and condition
Structural framing (steel, concrete, wood)
Visible settlement or movement
Floor systems and slabs
Load-bearing walls
Column and beam connections
Retaining walls
Expansion and control joints
Seismic / wind bracing (if applicable)
Visible cracking patterns
Below-grade waterproofing evidence

⚙ Components & Equipment

Reinforced Concrete Foundation
GOOD
Year Installed: 2006
Estimated R U L: 50+ years
No visible settlement, cracking, or displacement observed at accessible foundation elements.
Steel Frame - Columns & Beams
GOOD
Year Installed: 2006
Estimated R U L: 50+ years
Fireproofing intact in accessible areas. No corrosion or deformation.
Composite Metal Deck
GOOD
Year Installed: 2006
Estimated R U L: 50+ years
Structural deck in good condition where visible in mechanical spaces.

⚠ Findings & Observations

Structural Integrity - Sound
Positive
Building structure is sound with no evidence of settlement, lateral movement, or structural distress. Steel frame connections and fireproofing intact in accessible areas.
Minor Slab Cracking - Garage Level
Minor
Hairline shrinkage cracking observed in the garage-level concrete slab. Non-structural - typical of slab-on-grade construction in Florida.
Recommendation: Seal cracks with flexible epoxy to prevent moisture intrusion and monitor annually.
Estimated Cost: $1,500 - $2,500

4. Electrical Systems

Fair
Electrical service is 1,600A, 480/277V, 3-phase from FPL via a pad-mounted transformer. Main switchgear is a Square D QED-2 located in the ground-floor electrical room. Sub-distribution panels serve each floor. Emergency power is provided by a 150kW Generac diesel generator with automatic transfer switch (ATS).

☑ Inspection Checklist

9/14
Main electrical service (amps, voltage, phase)
Service entrance and metering
Main distribution panels
Sub-panels and branch circuits
Grounding and bonding
Emergency / standby generator
Transfer switch (automatic/manual)
Emergency lighting and exit signs
Interior lighting systems
Exterior and parking lot lighting
GFCI / AFCI protection where required
Electrical room accessibility
Transformer (if building-owned)
Visible code violations

⚙ Components & Equipment

Main Switchgear - Square D QED-2
GOOD
Manufacturer: Square D
Year Installed: 2006
Estimated R U L: 15+ years
1,600A, 480/277V. Recently serviced per maintenance records. Clean and organized.
Emergency Generator - 150kW Diesel
FAIR
Manufacturer: Generac
Year Installed: 2006
Estimated R U L: 5-8 years
Generac 150kW diesel generator. Block heater functional. Last load bank test: 6 months ago.
Automatic Transfer Switch (ATS)
CRITICAL
Manufacturer: ASCO
Year Installed: 2006
Estimated R U L: 0 years
ATS failed to transfer during test. Requires immediate repair or replacement.
Electrical Panels - Distribution
GOOD
Year Installed: 2006
Estimated R U L: 20+ years
Floor distribution panels properly labeled. No double-tapped breakers. AFCI/GFCI protection current.

⚠ Findings & Observations

ATS Transfer Switch Failure
Critical
The ASCO automatic transfer switch failed to transfer from utility to generator power during testing. The building will lose emergency power during a utility outage, affecting fire alarm panels, emergency lighting, elevator recall, and life safety systems.
Recommendation: IMMEDIATE: Engage licensed electrical contractor to diagnose and repair or replace the ATS. This is a life-safety issue that must be resolved within 30 days. Temporary manual transfer procedure should be documented until repaired.
Estimated Cost: $15,000 - $22,000
LED Lighting Upgrade Opportunity
Upgrade Recommended
Floors 2-4 still use T8 fluorescent fixtures in common areas. LED retrofit would reduce energy consumption by approximately 40%.
Recommendation: Consider LED retrofit as part of energy efficiency improvement plan. ROI typically 2-3 years.
Estimated Cost: $18,000 - $25,000
Switchgear in Good Condition
Positive
Main electrical switchgear is properly maintained with recent service records on file. Distribution panels are well-organized and properly labeled.

5. Plumbing Systems

Good
Domestic water supply is municipal via a 4" main with backflow preventer (BFP) assembly. Hot water is provided by two (2) A.O. Smith commercial gas-fired water heaters (75-gallon each). Waste piping is PVC throughout. Building is equipped with a grease trap serving the first-floor café tenant.

☑ Inspection Checklist

7/13
Water supply type and source
Water main size and material
Visible supply piping material and condition
Drain / waste / vent piping
Backflow prevention devices
Water heaters (commercial)
Booster pumps
Restroom fixtures and condition
Break room / kitchen plumbing
Floor drains and trench drains
Grease traps (if applicable)
Visible leaks or water damage
Sewer lateral condition (if scoped)

⚙ Components & Equipment

Domestic Water Main & BFP
GOOD
Year Installed: 2006
Estimated R U L: 25+ years
4" main with Watts 909 reduced pressure backflow preventer. Annual certification current.
Commercial Water Heaters (2x)
GOOD
Manufacturer: A.O. Smith
Year Installed: 2018
Estimated R U L: 5-7 years
Two 75-gallon commercial gas-fired units. Replaced in 2018. T&P valves functional.
Waste & Vent Piping
GOOD
Year Installed: 2006
Estimated R U L: 30+ years
PVC waste piping. No visible leaks or corrosion at accessible points.
Grease Trap
FAIR
Year Installed: 2006
Estimated R U L: 10+ years
1,000-gallon below-grade grease trap serving first-floor café. Pumping records available.

⚠ Findings & Observations

Restroom Fixture Updates Needed
Minor
3rd and 4th floor restroom faucets are original 2006 models with worn cartridges causing intermittent dripping.
Recommendation: Replace faucet cartridges or upgrade to touchless sensor faucets during planned tenant improvement.
Estimated Cost: $4,500 - $6,500
Water Heaters - Good Condition
Positive
The 2018 replacement water heaters are in good operating condition with 5-7 years of remaining service life.

6. HVAC & Mechanical Systems

Fair
HVAC is provided by four (4) Carrier Weathermaster rooftop units (RTU) with gas heat and DX cooling, ranging from 15-25 tons each. Total cooling capacity is approximately 80 tons. The system uses a Honeywell BAS (Building Automation System) for zone control. VAV boxes with electric reheat serve individual tenant suites.

☑ Inspection Checklist

8/14
Rooftop units (RTUs) - quantity, type, tonnage
Split systems / package units
Chiller / boiler systems
Air handling units (AHUs)
Ductwork (visible portions)
Exhaust and ventilation fans
Building automation / controls
Thermostats and zoning
Refrigerant type
Condensate drainage
Air filtration systems
Estimated remaining useful life per unit
Service history (if available)
Energy efficiency rating

⚙ Components & Equipment

RTU #1 - Carrier 25-Ton
GOOD
Manufacturer: Carrier
Year Installed: 2006
Estimated R U L: 3-5 years
Serving floors 1-2. Operating normally. Compressors drawing within rated amps.
RTU #2 - Carrier 25-Ton
GOOD
Manufacturer: Carrier
Year Installed: 2006
Estimated R U L: 3-5 years
Serving floors 3-4. Operating normally. Economizer functional.
RTU #3 - Carrier 15-Ton
POOR
Manufacturer: Carrier
Year Installed: 2006
Estimated R U L: 0-1 years
Common area unit. One of two compressors failed. Running at 50% capacity.
RTU #4 - Carrier 15-Ton
FAIR
Manufacturer: Carrier
Year Installed: 2006
Estimated R U L: 2-4 years
Server room / IT closets. Functioning but showing age. High-pressure readings.
Honeywell BAS Controls
GOOD
Manufacturer: Honeywell
Year Installed: 2015
Estimated R U L: 10+ years
Upgraded in 2015. Web-accessible. All sensors calibrated per recent records.

⚠ Findings & Observations

RTU #3 Compressor Failure
Major
RTU #3 (15-ton, serving common areas and lobby) has one of two compressors failed and is operating at 50% capacity. The unit is struggling to maintain setpoint during peak afternoon hours. Second compressor is showing elevated amp draw suggesting additional stress.
Recommendation: Replace RTU #3 with new high-efficiency unit. Given the age of all four RTUs, consider a phased replacement plan over 3-5 years starting with RTU #3.
Estimated Cost: $35,000 - $45,000
RTU #4 High-Pressure Readings
Repair Needed
RTU #4 serving IT closets showing elevated head pressure readings suggesting potential condenser coil fouling or refrigerant charge issues.
Recommendation: Schedule condenser coil cleaning and refrigerant charge check. If pressure persists, compressor evaluation needed.
Estimated Cost: $1,500 - $3,000
BAS System - Well Maintained
Positive
The 2015 Honeywell BAS upgrade is functioning well with web-based access and properly calibrated sensors. This represents a valuable building asset.

7. Fire & Life Safety

Fair
The building is fully sprinklered with a wet-pipe system fed by a dedicated 6" fire main. Fire alarm system is a Notifier NFS2-3030 addressable panel with smoke detectors, pull stations, horn/strobes, and elevator recall. The system is monitored 24/7 by a central station. Stairwells are pressurized. Fire extinguishers are serviced annually.

☑ Inspection Checklist

7/12
Fire alarm system type and panel
Sprinkler system type and coverage
Sprinkler riser and FDC
Fire extinguishers (location and tags)
Emergency exit signage and lighting
Means of egress (corridors, stairwells)
Fire-rated assemblies (doors, walls)
Smoke detectors and pull stations
Fire suppression (kitchen hood, clean agent)
Standpipe systems
Fire department access and key boxes
Last fire inspection date

⚙ Components & Equipment

Fire Sprinkler System - Wet Pipe
GOOD
Year Installed: 2006
Estimated R U L: 25+ years
Recently inspected and certified per NFPA 25. Backflow preventer tested.
Fire Alarm Panel - Notifier NFS2-3030
FAIR
Manufacturer: Notifier
Year Installed: 2006
Estimated R U L: 5-8 years
Addressable panel. Zone 7 (4th floor NE) showing persistent trouble signal.
Fire Pump - 500 GPM
GOOD
Year Installed: 2006
Estimated R U L: 15+ years
Electric fire pump. Annual flow test current. Jockey pump operational.

⚠ Findings & Observations

Fire Alarm Panel - Zone 7 Fault
Critical
The Notifier NFS2-3030 fire alarm panel is displaying a persistent trouble condition on Zone 7 (4th floor northeast wing). This zone encompasses 12 smoke detectors and 3 pull stations. A zone fault means these devices may not properly report an alarm condition.
Recommendation: IMMEDIATE: Dispatch fire alarm service contractor to diagnose and repair Zone 7 fault within 72 hours. Verify all detectors and pull stations in affected zone. This is a life-safety critical item per NFPA 72.
Estimated Cost: $2,500 - $5,000
Stairwell B - Handrail Non-Compliance
Deficient
Stairwell B handrail terminates abruptly at the 2nd-floor landing without the required code extension. Additionally, the guardrail balusters on the 3rd-floor landing exceed the maximum 4-inch spacing.
Recommendation: Install code-compliant handrail extensions and replace non-conforming baluster section per Florida Building Code.
Estimated Cost: $3,500 - $5,500
Sprinkler System - Recently Serviced
Positive
Fire sprinkler system has been recently inspected and certified in compliance with NFPA 25. All flow switches, tamper switches, and alarm devices tested satisfactorily.

8. Interior Spaces & Finishes

Good
Interior finishes vary by area. The 2019-renovated lobby features polished porcelain tile flooring, contemporary accent walls, and LED cove lighting in excellent condition. Tenant suites have standard VCT or carpet tile flooring, painted drywall, and 2x4 suspended ACT ceilings. Common corridors have VCT flooring and painted CMU walls.

☑ Inspection Checklist

6/12
Common area finishes and condition
Lobbies and corridors
Ceiling types and condition (drop tile, drywall, exposed)
Flooring types and condition
Interior wall condition
Restroom condition and compliance
Break rooms / kitchenettes
Tenant improvements (TIs) condition
Interior doors and hardware
Window treatments
Visible water damage / staining
Evidence of mold or moisture

⚙ Components & Equipment

Lobby & Common Area Finishes
EXCELLENT
Year Installed: 2019
Estimated R U L: 15+ years
2019 renovation. Porcelain tile, accent walls, LED lighting. Immaculate condition.
Corridor Flooring - VCT
FAIR
Year Installed: 2006
Estimated R U L: 3-5 years
Original VCT showing wear patterns at high-traffic intersections.
Ceiling System - 2x4 ACT
GOOD
Year Installed: 2006
Estimated R U L: 10+ years
Suspended acoustical ceiling tiles. Isolated staining near RTU #3 condensate line.

⚠ Findings & Observations

VCT Replacement - High-Traffic Areas
Cosmetic
VCT flooring in 2nd and 3rd floor corridors shows significant wear and discoloration at intersections and elevator lobbies.
Recommendation: Replace worn VCT sections or consider upgrading to LVP (luxury vinyl plank) for improved durability and aesthetics.
Estimated Cost: $12,000 - $16,000
Ceiling Tile Staining - 2nd Floor
Minor
Water staining on three (3) ceiling tiles near RTU #3 condensate drain line on the 2nd floor. No active leak observed.
Recommendation: Replace stained tiles after confirming condensate drain repair from HVAC findings.
Estimated Cost: $300 - $500
2019 Lobby Renovation - Showcase Condition
Positive
The renovated lobby and common areas are in showcase condition, representing a significant value-add to the property.

9. ADA Accessibility

Good
The building generally meets ADA accessibility requirements with accessible parking, ramped entrances, accessible restrooms on each floor, and elevator access to all levels. Signage includes Braille placards at all rooms. The 2019 renovation brought the lobby and first-floor common areas into full current compliance.

☑ Inspection Checklist

5/10
Accessible parking spaces and signage
Accessible route from parking to entry
Entry door width and hardware
Interior accessible routes
Restroom accessibility
Elevator accessibility features
Ramps and handrails
Signage (Braille, tactile)
Counter and service desk heights
Disclaimer: Not a full ADA audit

⚠ Findings & Observations

Accessible Parking - Slope Concern
Minor
Two of five designated accessible parking spaces show cross-slope slightly exceeding the 2% maximum per ADA Standards §502.4.
Recommendation: Mill and overlay the affected accessible parking spaces to restore compliant cross-slope.
Estimated Cost: $3,000 - $4,500
First Floor - Full ADA Compliance
Positive
The 2019 renovation brought all first-floor facilities into full ADA compliance including automatic door operators, compliant restrooms, and tactile wayfinding.

10. Parking & Paving

Fair
The property has 285 surface parking spaces across two lots (main lot and overflow). Asphalt paving was last seal-coated in 2020. Concrete curbing, wheel stops, and LED pole lighting (upgraded 2017).

☑ Inspection Checklist

5/10
Parking lot surface type and condition
Striping and markings
ADA-compliant spaces
Curbing and wheel stops
Sidewalks and pedestrian paths
Drainage and storm drains
Lighting in parking areas
Entrance / exit signage
Speed bumps / traffic calming
Structural parking (garages) if applicable

⚙ Components & Equipment

Asphalt Parking - Main Lot
FAIR
Year Installed: 2006
Estimated R U L: 3-5 years
Significant alligator cracking in SE quadrant. Last seal coat 2020.
Asphalt Parking - Overflow Lot
GOOD
Year Installed: 2006
Estimated R U L: 5-8 years
Less traffic, better condition. Minor longitudinal cracking.
Parking Lot LED Lighting
EXCELLENT
Year Installed: 2017
Estimated R U L: 15+ years
LED pole lights upgraded 2017. All operational. Timer and photocell controlled.

⚠ Findings & Observations

Main Parking Lot - Alligator Cracking
Major
Approximately 3,500 SF of alligator cracking in the SE quadrant of the main parking lot indicating base failure. Crack sealing will not be effective - this area requires removal and replacement.
Recommendation: Mill and overlay the affected 3,500 SF area with new 2" asphalt after base repair. Consider full lot mill and overlay within 3-5 year capital plan.
Estimated Cost: $22,000 - $30,000
Striping & ADA Markings
Maintenance
Parking striping is faded in multiple areas. ADA symbol markings need repainting.
Recommendation: Full lot restriping including ADA markings, fire lanes, and directional arrows.
Estimated Cost: $4,500 - $6,000

11. Elevators & Conveying Systems

Fair
The building has two (2) hydraulic passenger elevators manufactured by ThyssenKrupp, each with 3,500 lb capacity serving all four floors. Elevators are under full-service maintenance contract with Schindler.

☑ Inspection Checklist

8/10
Elevator type (hydraulic, traction, MRL)
Number of elevators
Current inspection certificate
Cab condition and finishes
Door operation and alignment
Machine room condition
Emergency phone and alarm
ADA compliance features
Escalators (if present)
Freight / service elevators

⚙ Components & Equipment

Elevator #1 - ThyssenKrupp Hydraulic
GOOD
Manufacturer: ThyssenKrupp
Year Installed: 2006
Estimated R U L: 5-8 years
3,500 lb capacity. Smooth operation. Cab finishes updated 2019.
Elevator #2 - ThyssenKrupp Hydraulic
FAIR
Manufacturer: ThyssenKrupp
Year Installed: 2006
Estimated R U L: 3-5 years
Oil seepage noted at hydraulic cylinder. Door alignment slightly off on 3rd floor.

⚠ Findings & Observations

Elevator #2 - Hydraulic Seal Leak
Major
Elevator #2 hydraulic cylinder is showing oil seepage at the packing gland seal. Oil containment pan is approximately 40% full. If seal failure progresses, elevator will lose pressure and go out of service.
Recommendation: Schedule hydraulic cylinder repacking with Schindler under maintenance contract. Install secondary containment pan. Monitor oil level weekly until repaired.
Estimated Cost: $8,000 - $12,000
Elevator Modernization Planning
Monitor
Both elevators are approaching 20 years of service. While currently functional, hydraulic elevator systems of this vintage typically require modernization between 20-25 years.
Recommendation: Begin budgeting for full elevator modernization within the next 5-year capital plan. Estimated modernization cost per car: $150,000-$200,000.
Estimated Cost: $300,000 - $400,000

12. Site & Grounds

Good
The 3.2-acre site includes landscaped areas with mature plantings, concrete sidewalks, a stormwater retention pond (south side), perimeter fencing along the west boundary, and monument signage at the main entrance. Landscape maintenance is performed by a contract service on a weekly schedule.

☑ Inspection Checklist

5/10
Site grading and drainage
Stormwater management (retention, swales)
Landscaping and irrigation
Fencing and security gates
Dumpster enclosures
Exterior signage and monument signs
Underground utilities (visible evidence)
Outdoor seating / common areas
Retaining walls
Detention / retention ponds

⚙ Components & Equipment

Stormwater Retention Pond
GOOD
Year Installed: 2006
Estimated R U L: 20+ years
SFWMD-permitted retention area. Outfall control structure functional.
Concrete Sidewalks & Walkways
GOOD
Year Installed: 2006
Estimated R U L: 15+ years
Good condition. Minor settling at one (1) expansion joint near south entrance.
Irrigation System
GOOD
Year Installed: 2006
Estimated R U L: 10+ years
Automatic zones with rain sensor. Heads adjusted and operational.

⚠ Findings & Observations

Sidewalk Settling - South Entrance
Minor
One sidewalk section near the south entrance has settled approximately ¾" creating a trip hazard lip.
Recommendation: Mud-jack or replace the affected 4x4 sidewalk section to eliminate trip hazard.
Estimated Cost: $800 - $1,200
Landscape - Well Maintained
Positive
Landscape is professionally maintained with healthy mature plantings, clean beds, and functioning irrigation.

13. Loading Docks & Warehousing

Good
The building has one (1) recessed loading dock on the north side with a dock leveler, one (1) overhead coiling door, and a bumper system. A separate dumpster enclosure is adjacent. The service corridor connects to the freight elevator and main electrical/mechanical rooms.

☑ Inspection Checklist

5/10
Dock doors (quantity, type, condition)
Dock levelers and bumpers
Dock seals and shelters
Truck court condition
Clear heights (warehouse areas)
Column spacing
Floor load capacity
Warehouse lighting
Racking systems (if permanently installed)
Roll-up / sectional doors

⚙ Components & Equipment

Dock Leveler - Rite-Hite
GOOD
Manufacturer: Rite-Hite
Year Installed: 2006
Estimated R U L: 10+ years
Mechanical dock leveler. Springs and lip in good condition. Properly lubricated.
Overhead Coiling Door
GOOD
Year Installed: 2006
Estimated R U L: 10+ years
Wayne Dalton insulated coiling door. Motor and chain drive operational.

⚠ Findings & Observations

Dock Bumpers - Minor Wear
Maintenance
Dock bumper pads show moderate compression and surface wear from use.
Recommendation: Replace dock bumper pads during next scheduled maintenance cycle.
Estimated Cost: $600 - $900

14. Environmental Observations

Good
A visual environmental screening was conducted as part of this PCA. The building was constructed in 2006, which is after the regulatory phase-out of asbestos-containing materials (ACMs) and lead-based paint (LBP). No indicators of contamination, underground storage tanks, or hazardous material concerns were identified during the walk-through survey.

☑ Inspection Checklist

4/9
Evidence of hazardous materials storage
Asbestos-containing materials (visual only)
Lead paint indicators (pre-1978 buildings)
Underground storage tanks (evidence)
Staining or contamination on site
PCB-containing equipment (old transformers)
Mold or biological growth
Radon potential
Disclaimer: Not a Phase I ESA

⚠ Findings & Observations

Transformer Pad - No Visible Staining
Info
The FPL pad-mounted transformer was visually inspected. No oil staining, leaking, or evidence of PCB contamination was observed.
Recommendation: Continue monitoring during routine grounds maintenance. Report any new staining to FPL.
IAQ - No Concerns
Positive
No visible mold, unusual odors, or indoor air quality concerns observed in any accessible areas of the building. HVAC air filtration is MERV-13.

15. Signage & Exterior Features

Good
Building signage includes a monument sign at the main entrance, building-mounted channel letters, and tenant directory board in the lobby. All illuminated signs operational. Wayfinding signage is ADA-compliant Braille placards.

☑ Inspection Checklist

4/10
Monument / ground signage condition
Building-mounted signs and attachments
Illuminated signage (bulbs, ballasts, wiring)
Wayfinding and directional signage
Tenant identification signage
ADA-compliant signage (exits, restrooms)
Sign permits and code compliance
Electrical connections to signs
Fading, damage, or graffiti
Digital / LED signage (if present)

⚙ Components & Equipment

Monument Sign
GOOD
Year Installed: 2019
Estimated R U L: 15+ years
LED-illuminated monument sign. Updated during 2019 renovation.
Channel Letter Signage
GOOD
Year Installed: 2006
Estimated R U L: 5-8 years
Building-mounted illuminated channel letters. Two (2) LED modules dim on 'C'.

⚠ Findings & Observations

Channel Letter - Dim LEDs
Cosmetic
Two LED modules in the building-mounted channel letter 'C' of 'Center' are dimmer than adjacent modules.
Recommendation: Replace dim LED modules. Consider full LED driver replacement for consistent illumination.
Estimated Cost: $400 - $700

16. Mechanical Systems

Good
Non-HVAC mechanical systems include domestic water booster pump, sewage ejector pump, garage exhaust fans, stairwell pressurization fans, and restroom exhaust systems. All systems observed in operational condition.

☑ Inspection Checklist

5/12
Mechanical equipment inventory
Overall mechanical systems condition
Ventilation systems and fresh air intake
Exhaust systems (kitchen, restroom, garage)
Pumps and motors (sump, booster, circulating)
Mechanical controls and automation
Compressed air systems (if applicable)
Process piping (visible portions)
Mechanical room accessibility and organization
Equipment maintenance records (if available)
Vibration, noise, or overheating indicators
Estimated remaining useful life per unit

⚙ Components & Equipment

Domestic Water Booster Pump
GOOD
Manufacturer: Grundfos
Year Installed: 2014
Estimated R U L: 8-10 years
VFD-controlled booster. Replaced in 2014. Operating within parameters.
Sewage Ejector Pump
GOOD
Year Installed: 2006
Estimated R U L: 5-8 years
Duplex system with float controls. Both pumps operational. No alarm history.
Stairwell Pressurization Fans (2x)
GOOD
Year Installed: 2006
Estimated R U L: 10-15 years
Supply fans for stairwell pressurization. Both operational and tested.

⚠ Findings & Observations

Garage Exhaust Fan - Bearing Noise
Monitor
Lower garage exhaust fan is producing a faint bearing noise during operation. Currently functional but indicates early bearing wear.
Recommendation: Monitor monthly. Schedule bearing replacement during next quarterly maintenance period.
Estimated Cost: $1,200 - $1,800

17. General Observations & Summary

Good
The Treasure Coast Executive Center is a well-maintained Class A office building that reflects a generally proactive ownership approach to maintenance and capital investment. The 2019 lobby renovation significantly improved the building's market appeal. The primary capital concerns center around the aging roof membrane, HVAC equipment approaching end of life, and the critical ATS and fire alarm issues requiring immediate attention. With a structured 5-year capital improvement plan addressing the identified items, this property should maintain its competitive Class A positioning in the Treasure Coast market.

☑ Inspection Checklist

4/11
Overall building condition assessment
Deferred maintenance level (low / moderate / high)
Capital expenditure priorities identified
Energy efficiency observations and recommendations
Security systems and access control
Telecommunications infrastructure
Building management / automation systems
Tenant improvement condition (general)
Insurance and risk observations
Compliance with local ordinances (general)
Recommendations for further specialized assessment

⚠ Findings & Observations

Overall Maintenance Program - Adequate
Positive
The property demonstrates an organized maintenance approach with service contracts in place for HVAC, elevator, fire alarm, landscaping, and janitorial. Maintenance records are available and current.
5-Year Capital Plan Recommended
Deferred Cost
Given the age of major building systems (roof, HVAC, elevators at 20 years), a comprehensive 5-year capital improvement plan is recommended to systematically address replacement needs while protecting the building's Class A positioning.
Recommendation: Develop a phased capital improvement plan prioritizing: (1) Immediate safety items, (2) Roof replacement, (3) HVAC phased replacement, (4) Elevator modernization planning. Estimated total 5-year capital need: $550,000 - $750,000.
Estimated Cost: $550,000 - $750,000

Compliance Observations Summary

This section consolidates all regulatory and code-related observations from the Fire & Life Safety, ADA Accessibility, and Environmental sections of this assessment. These are visual observations only and do not constitute formal code compliance audits, ADA surveys, or Phase I/II Environmental Site Assessments.
🔥
Fire & Life Safety
Fair 3 findings
ADA Accessibility
Good 2 findings
🌿
Environmental
Good 2 findings
7
Total Compliance Findings
🔥

Fire & Life Safety

Fair
The building is fully sprinklered with a wet-pipe system fed by a dedicated 6" fire main. Fire alarm system is a Notifier NFS2-3030 addressable panel with smoke detectors, pull stations, horn/strobes, and elevator recall. The system is monitored 24/7 by a central station. Stairwells are pressurized....
# Finding Severity Description Recommendation
1 Fire Alarm Panel - Zone 7 Fault Critical The Notifier NFS2-3030 fire alarm panel is displaying a persistent trouble condition on Zone 7 (4th floor northeast wing). This zone encompasses 12 sm... IMMEDIATE: Dispatch fire alarm service contractor to diagnose and repair Zone 7 fault within 72 hours. Verify all detect...
2 Stairwell B - Handrail Non-Compliance Deficient Stairwell B handrail terminates abruptly at the 2nd-floor landing without the required code extension. Additionally, the guardrail balusters on the 3r... Install code-compliant handrail extensions and replace non-conforming baluster section per Florida Building Code.
3 Sprinkler System - Recently Serviced Positive Fire sprinkler system has been recently inspected and certified in compliance with NFPA 25. All flow switches, tamper switches, and alarm devices test...

ADA Accessibility

Good
The building generally meets ADA accessibility requirements with accessible parking, ramped entrances, accessible restrooms on each floor, and elevator access to all levels. Signage includes Braille placards at all rooms. The 2019 renovation brought the lobby and first-floor common areas into full c...
# Finding Severity Description Recommendation
1 Accessible Parking - Slope Concern Minor Two of five designated accessible parking spaces show cross-slope slightly exceeding the 2% maximum per ADA Standards §502.4. Mill and overlay the affected accessible parking spaces to restore compliant cross-slope.
2 First Floor - Full ADA Compliance Positive The 2019 renovation brought all first-floor facilities into full ADA compliance including automatic door operators, compliant restrooms, and tactile w...
🌿

Environmental

Good
A visual environmental screening was conducted as part of this PCA. The building was constructed in 2006, which is after the regulatory phase-out of asbestos-containing materials (ACMs) and lead-based paint (LBP). No indicators of contamination, underground storage tanks, or hazardous material conce...
# Finding Severity Description Recommendation
1 Transformer Pad - No Visible Staining Info The FPL pad-mounted transformer was visually inspected. No oil staining, leaking, or evidence of PCB contamination was observed. Continue monitoring during routine grounds maintenance. Report any new staining to FPL.
2 IAQ - No Concerns Positive No visible mold, unusual odors, or indoor air quality concerns observed in any accessible areas of the building. HVAC air filtration is MERV-13.
ⓘ Important Notice
These observations are based on a visual, walk-through survey and do not constitute formal compliance audits. For definitive compliance determinations, qualified professionals should be retained to perform full ADA surveys, fire code inspections, or Phase I/II Environmental Site Assessments as applicable.

Capital Expenditure & Deferred Maintenance Summary

The following table organizes all identified repair, replacement, and maintenance items by priority timeframe based on severity assessment. Cost estimates are approximate and intended for budgetary planning purposes only.

Immediate (0-6 months)

2 items
System Item Severity Est. Cost
Electrical Systems ATS Transfer Switch Failure Critical $15,000 - $22,000
Fire & Life Safety Fire Alarm Panel - Zone 7 Fault Critical $2,500 - $5,000
Subtotal - Immediate (0-6 months): $22,250

Short-Term (6-24 months)

6 items
System Item Severity Est. Cost
Roofing Systems TPO Membrane - End of Useful Life Major $145,000 - $185,000
HVAC & Mechanical Systems RTU #3 Compressor Failure Major $35,000 - $45,000
HVAC & Mechanical Systems RTU #4 High-Pressure Readings Repair Needed $1,500 - $3,000
Fire & Life Safety Stairwell B - Handrail Non-Compliance Deficient $3,500 - $5,500
Parking & Paving Main Parking Lot - Alligator Cracking Major $22,000 - $30,000
Elevators & Conveying Systems Elevator #2 - Hydraulic Seal Leak Major $8,000 - $12,000
Subtotal - Short-Term (6-24 months): $247,750

Mid-Term (2-5 years)

9 items
System Item Severity Est. Cost
Roofing Systems Ponding Water - NW Corner Minor $3,500 - $5,000
Building Envelope & Exterior Failed IGU Seals - 3rd Floor East Minor $2,200 - $3,000
Structural Systems Minor Slab Cracking - Garage Level Minor $1,500 - $2,500
Electrical Systems LED Lighting Upgrade Opportunity Upgrade Recommended $18,000 - $25,000
Plumbing Systems Restroom Fixture Updates Needed Minor $4,500 - $6,500
Interior Spaces & Finishes Ceiling Tile Staining - 2nd Floor Minor $300 - $500
ADA Accessibility Accessible Parking - Slope Concern Minor $3,000 - $4,500
Site & Grounds Sidewalk Settling - South Entrance Minor $800 - $1,200
General Observations & Summary 5-Year Capital Plan Recommended Deferred Cost $550,000 - $750,000
Subtotal - Mid-Term (2-5 years): $691,000

Long-Term (5-10+ years)

4 items
System Item Severity Est. Cost
Interior Spaces & Finishes VCT Replacement - High-Traffic Areas Cosmetic $12,000 - $16,000
Elevators & Conveying Systems Elevator Modernization Planning Monitor $300,000 - $400,000
Signage & Exterior Features Channel Letter - Dim LEDs Cosmetic $400 - $700
Mechanical Systems Garage Exhaust Fan - Bearing Noise Monitor $1,200 - $1,800
Subtotal - Long-Term (5-10+ years): $366,050

Ongoing Maintenance

4 items
System Item Severity Est. Cost
Roofing Systems Roof Hatch Seal Maintenance $350 - $500
Building Envelope & Exterior Exterior Sealant Maintenance Maintenance $8,000 - $12,000
Parking & Paving Striping & ADA Markings Maintenance $4,500 - $6,000
Loading Docks & Warehousing Dock Bumpers - Minor Wear Maintenance $600 - $900
Subtotal - Ongoing Maintenance: $16,425
Total Estimated Capital Expenditure
Across all priority timeframes (midpoint of ranges used where applicable)
$1,343,475
⚠ Important Disclaimer
Cost estimates are approximate and based on current market conditions at the time of inspection. Actual costs may vary based on contractor availability, material prices, scope changes, and market conditions. It is recommended that formal bids be obtained from licensed, qualified contractors for all identified items prior to budgeting or repair execution.

Remaining Useful Life (RUL) Summary

The following matrix summarizes the estimated remaining useful life of major building systems and equipment. RUL estimates are based on industry standards, visual observation, and manufacturer specifications where available. Actual useful life may vary based on maintenance practices, usage patterns, and environmental conditions.
System Component / Equipment Year Installed Approx. Age Condition Est. RUL
Roofing Systems TPO Membrane Roof System 2006 20 yrs Fair 0-2 years
Roofing Systems Roof Drainage - Internal Drains 2006 20 yrs Good 15+ years
Roofing Systems Metal Flashing & Copings 2006 20 yrs Fair 3-5 years
Building Envelope & Exterior Stucco Wall System 2006 20 yrs Good 15+ years
Building Envelope & Exterior Aluminum Curtain Wall - 1st Floor 2019 7 yrs Excellent 20+ years
Building Envelope & Exterior Window Systems - Floors 2-4 2006 20 yrs Good 10-15 years
Building Envelope & Exterior Exterior Caulking & Sealants 2019 7 yrs Fair 3-5 years
Structural Systems Reinforced Concrete Foundation 2006 20 yrs Good 50+ years
Structural Systems Steel Frame - Columns & Beams 2006 20 yrs Good 50+ years
Structural Systems Composite Metal Deck 2006 20 yrs Good 50+ years
Electrical Systems Main Switchgear - Square D QED-2 2006 20 yrs Good 15+ years
Electrical Systems Emergency Generator - 150kW Diesel 2006 20 yrs Fair 5-8 years
Electrical Systems Automatic Transfer Switch (ATS) 2006 20 yrs Critical - Immediate Attention Required 0 years
Electrical Systems Electrical Panels - Distribution 2006 20 yrs Good 20+ years
Plumbing Systems Domestic Water Main & BFP 2006 20 yrs Good 25+ years
Plumbing Systems Commercial Water Heaters (2x) 2018 8 yrs Good 5-7 years
Plumbing Systems Waste & Vent Piping 2006 20 yrs Good 30+ years
Plumbing Systems Grease Trap 2006 20 yrs Fair 10+ years
HVAC & Mechanical Systems RTU #1 - Carrier 25-Ton 2006 20 yrs Good 3-5 years
HVAC & Mechanical Systems RTU #2 - Carrier 25-Ton 2006 20 yrs Good 3-5 years
HVAC & Mechanical Systems RTU #3 - Carrier 15-Ton 2006 20 yrs Poor 0-1 years
HVAC & Mechanical Systems RTU #4 - Carrier 15-Ton 2006 20 yrs Fair 2-4 years
HVAC & Mechanical Systems Honeywell BAS Controls 2015 11 yrs Good 10+ years
Fire & Life Safety Fire Sprinkler System - Wet Pipe 2006 20 yrs Good 25+ years
Fire & Life Safety Fire Alarm Panel - Notifier NFS2-3030 2006 20 yrs Fair 5-8 years
Fire & Life Safety Fire Pump - 500 GPM 2006 20 yrs Good 15+ years
Interior Spaces & Finishes Lobby & Common Area Finishes 2019 7 yrs Excellent 15+ years
Interior Spaces & Finishes Corridor Flooring - VCT 2006 20 yrs Fair 3-5 years
Interior Spaces & Finishes Ceiling System - 2x4 ACT 2006 20 yrs Good 10+ years
Parking & Paving Asphalt Parking - Main Lot 2006 20 yrs Fair 3-5 years
Parking & Paving Asphalt Parking - Overflow Lot 2006 20 yrs Good 5-8 years
Parking & Paving Parking Lot LED Lighting 2017 9 yrs Excellent 15+ years
Elevators & Conveying Systems Elevator #1 - ThyssenKrupp Hydraulic 2006 20 yrs Good 5-8 years
Elevators & Conveying Systems Elevator #2 - ThyssenKrupp Hydraulic 2006 20 yrs Fair 3-5 years
Site & Grounds Stormwater Retention Pond 2006 20 yrs Good 20+ years
Site & Grounds Concrete Sidewalks & Walkways 2006 20 yrs Good 15+ years
Site & Grounds Irrigation System 2006 20 yrs Good 10+ years
Loading Docks & Warehousing Dock Leveler - Rite-Hite 2006 20 yrs Good 10+ years
Loading Docks & Warehousing Overhead Coiling Door 2006 20 yrs Good 10+ years
Signage & Exterior Features Monument Sign 2019 7 yrs Good 15+ years
Signage & Exterior Features Channel Letter Signage 2006 20 yrs Good 5-8 years
Mechanical Systems Domestic Water Booster Pump 2014 12 yrs Good 8-10 years
Mechanical Systems Sewage Ejector Pump 2006 20 yrs Good 5-8 years
Mechanical Systems Stairwell Pressurization Fans (2x) 2006 20 yrs Good 10-15 years
End of Life / Replacement Needed
Near End of Life (1-3 years)
Serviceable Life Remaining
RUL = Remaining Useful Life. Estimates are based on industry-standard expected service life for equipment type and observed condition. These are planning estimates only and should be verified with manufacturer specifications and service records.

Building Systems Lifecycle Timeline

Visual representation of each system's current age relative to its expected useful life. Systems exceeding their expected lifespan are highlighted for priority replacement planning.
Corridor Flooring - VCT - Interior Spaces & Finishes
20 yrs of 15 yr expected
⚠ 120% - PAST EXPECTED LIFE
Sewage Ejector Pump - Mechanical Systems
20 yrs of 15 yr expected
⚠ 120% - PAST EXPECTED LIFE
RTU #1 - Carrier 25-Ton - HVAC & Mechanical Systems
20 yrs of 20 yr expected
100%
RTU #2 - Carrier 25-Ton - HVAC & Mechanical Systems
20 yrs of 20 yr expected
100%
RTU #3 - Carrier 15-Ton - HVAC & Mechanical Systems
20 yrs of 20 yr expected
100%
RTU #4 - Carrier 15-Ton - HVAC & Mechanical Systems
20 yrs of 20 yr expected
100%
Ceiling System - 2x4 ACT - Interior Spaces & Finishes
20 yrs of 20 yr expected
100%
Asphalt Parking - Main Lot - Parking & Paving
20 yrs of 20 yr expected
100%
Asphalt Parking - Overflow Lot - Parking & Paving
20 yrs of 20 yr expected
100%
TPO Membrane Roof System - Roofing Systems
20 yrs of 25 yr expected
80%
Roof Drainage - Internal Drains - Roofing Systems
20 yrs of 25 yr expected
80%
Metal Flashing & Copings - Roofing Systems
20 yrs of 25 yr expected
80%
Window Systems - Floors 2-4 - Building Envelope & Exterior
20 yrs of 25 yr expected
80%
Steel Frame - Columns & Beams - Structural Systems
20 yrs of 25 yr expected
80%
Composite Metal Deck - Structural Systems
20 yrs of 25 yr expected
80%
Emergency Generator - 150kW Diesel - Electrical Systems
20 yrs of 25 yr expected
80%
Automatic Transfer Switch (ATS) - Electrical Systems
20 yrs of 25 yr expected
80%
Domestic Water Main & BFP - Plumbing Systems
20 yrs of 25 yr expected
80%
Waste & Vent Piping - Plumbing Systems
20 yrs of 25 yr expected
80%
Grease Trap - Plumbing Systems
20 yrs of 25 yr expected
80%
Fire Pump - 500 GPM - Fire & Life Safety
20 yrs of 25 yr expected
80%
Elevator #1 - ThyssenKrupp Hydraulic - Elevators & Conveying Systems
20 yrs of 25 yr expected
80%
Elevator #2 - ThyssenKrupp Hydraulic - Elevators & Conveying Systems
20 yrs of 25 yr expected
80%
Stormwater Retention Pond - Site & Grounds
20 yrs of 25 yr expected
80%
Irrigation System - Site & Grounds
20 yrs of 25 yr expected
80%
Dock Leveler - Rite-Hite - Loading Docks & Warehousing
20 yrs of 25 yr expected
80%
Overhead Coiling Door - Loading Docks & Warehousing
20 yrs of 25 yr expected
80%
Channel Letter Signage - Signage & Exterior Features
20 yrs of 25 yr expected
80%
Domestic Water Booster Pump - Mechanical Systems
12 yrs of 15 yr expected
80%
Stairwell Pressurization Fans (2x) - Mechanical Systems
20 yrs of 25 yr expected
80%
Reinforced Concrete Foundation - Structural Systems
20 yrs of 30 yr expected
67%
Electrical Panels - Distribution - Electrical Systems
20 yrs of 30 yr expected
67%
Commercial Water Heaters (2x) - Plumbing Systems
8 yrs of 12 yr expected
67%
Fire Alarm Panel - Notifier NFS2-3030 - Fire & Life Safety
20 yrs of 30 yr expected
67%
Concrete Sidewalks & Walkways - Site & Grounds
20 yrs of 30 yr expected
67%
Main Switchgear - Square D QED-2 - Electrical Systems
20 yrs of 35 yr expected
57%
Stucco Wall System - Building Envelope & Exterior
20 yrs of 40 yr expected
50%
Parking Lot LED Lighting - Parking & Paving
9 yrs of 20 yr expected
45%
Honeywell BAS Controls - HVAC & Mechanical Systems
11 yrs of 25 yr expected
44%
Fire Sprinkler System - Wet Pipe - Fire & Life Safety
20 yrs of 50 yr expected
40%
Aluminum Curtain Wall - 1st Floor - Building Envelope & Exterior
7 yrs of 25 yr expected
28%
Lobby & Common Area Finishes - Interior Spaces & Finishes
7 yrs of 25 yr expected
28%
Monument Sign - Signage & Exterior Features
7 yrs of 25 yr expected
28%
Exterior Caulking & Sealants - Building Envelope & Exterior
7 yrs of 30 yr expected
23%
0-49% Life Used
50-74% Life Used
75-99% Life Used
Past Expected Life
Expected lifespan values are based on industry-standard averages (ASHRAE, BOMA, InterNACHI). Actual service life varies with maintenance, climate, and usage.

Limitations & Disclaimers

This inspection was performed in accordance with the International Standards of Practice for Inspecting Commercial Properties (ComSOP) as adopted by the Commercial Property Inspectors Association (CCPIA) and consistent with ASTM E2018 guidelines for Property Condition Assessments.

Scope Limitations: This report is a visual, walk-through survey of the property's readily accessible areas and systems. It does not include destructive testing, engineering analysis, code compliance audits, environmental testing (Phase I/II ESA), detailed ADA compliance audits, or specialized testing for hazardous materials including asbestos, lead, mold, or radon.

Concealed Conditions: The inspector cannot identify conditions that are concealed behind walls, above ceilings, below floors, underground, or otherwise inaccessible at the time of inspection.

Environmental Disclaimer: This report does not constitute a Phase I Environmental Site Assessment.

Cost Estimates: Any cost estimates provided are approximate and intended for budgetary planning purposes only. Actual costs may vary based on contractor availability, material costs, scope refinement, and market conditions. Formal bids from licensed contractors are recommended for all repairs.

Remaining Useful Life (RUL): RUL estimates are based on industry standards and visual observation. Actual useful life may vary based on maintenance history, usage, and environmental factors.

Inspector Certification

Vcita Home Inspection & Service LLC
Lead Inspector: Calvin S. Johnson
License: FL#HI2622
Phone: (772) 224-5655
Certification: CCPIA Certified Commercial Property Inspector
Inspection Date: July 16, 2026 - July 18, 2026 (3 days)
Report Number: CIR-2026-SAMPLE
CCPIA Certified

Inspection Team

Name Role License Specialty
Robert Martinez Inspector II FL#HI4891 HVAC & Mechanical
Amanda Chen Inspector II FL#HI5230 Electrical & Fire Systems