Sample Report - This is an example of what your 11-Month Warranty Inspection Report looks like
Back to Service
Vcita Home Inspection & Service LLC
11-Month Warranty Inspection Report

1234 Oakwood Drive

Port St. Lucie, FL 34987
April 24, 2026
Calvin Wilson
Report #WI-2026-0412
Overall Score
65/ 72
Items Passing
65
Passed
7
Builder Attention
187
Photos
12
Trades Inspected

Executive Summary

For the homeowner - a plain-language overview.

Your home at 1234 Oakwood Drive is in overall excellent condition for its 11 months of age. We performed a full-systems inspection covering all 12 major trade categories and documented each item with photos. Of the 72 items checked, 65 passedwithout issue. We identified 7 items that fall within your builder's one-year warranty and should be addressed before it expires on May 15, 2026.

None of the findings are structural or safety-critical. Most are normal year-one cosmetic and mechanical issues that builders routinely cover under warranty. We've prepared a letter (see end of report) you can forward to your builder's warranty department to formally request these repairs.

Roofing & Gutters

Structural roof condition, flashing integrity, drainage components.

1 to fix
5 passed
Shingle/Tile Condition
Passed

Inspect for lifting, curling, granule loss, cracked tiles, missing pieces.

4 photos attached
Flashing & Penetrations
Passed

Verify sealing at vents, pipes, skylights, chimney, wall-to-roof transitions.

4 photos attached
Ridge & Soffit Ventilation
Passed

Ensure proper airflow and that vents are unobstructed and screened.

5 photos attached
Gutters & Downspouts
Builder to Fix

Northwest downspout lacks splash block or extension; water is discharging directly at foundation wall. Recommend adding 4' extension or splash block.

7 photos attached• Warranty-covered fix
Soffit & Fascia
Passed

Inspect for damage, moisture, paint condition, bird/rodent access.

4 photos attached
Valleys & Drip Edge
Passed

Confirm proper valley sealing and drip edge installation.

7 photos attached

Stucco & Exterior Walls

Exterior wall envelope, coating, and moisture control.

1 to fix
5 passed
Stucco Cracks & Spalling
Builder to Fix

Hairline vertical crack approximately 18" long observed above garage window (east elevation). Cosmetic, but should be sealed and touched up by builder.

4 photos attached• Warranty-covered fix
Efflorescence & Staining
Passed

Identify white powdery deposits indicating moisture intrusion.

3 photos attached
Caulking & Sealants
Passed

Inspect windows, doors, penetrations, expansion joints for gaps.

7 photos attached
Paint & Coating
Passed

Check for peeling, chalking, fading, and proper coverage.

6 photos attached
Siding / Veneer Integrity
Passed

Examine for loose panels, gaps, improper lap, or damage.

3 photos attached
Expansion & Control Joints
Passed

Verify joints present and properly sealed to prevent cracking.

3 photos attached

HVAC System

Heating, cooling, ventilation, and air distribution.

1 to fix
5 passed
Condensate Drain Line
Builder to Fix

Secondary condensate line terminates above attic platform without overflow pan drain. Recommend builder install approved drain connection per code.

3 photos attached• Warranty-covered fix
Air Handler Unit
Passed

Visual of coils, blower motor, plenum, attic platform, drip pan.

5 photos attached
Airflow at Registers
Passed

Measure temperature differential, verify all rooms get supply and return.

6 photos attached
Thermostat Operation
Passed

Test cooling, heating, fan modes; calibration of set vs actual temp.

3 photos attached
Ductwork Integrity
Passed

Inspect accessible duct runs for crushed sections, loose connections, sealed joints.

4 photos attached
Filter Access & Condition
Passed

Confirm filter is accessible, properly sized, and clean/new.

5 photos attached

Plumbing

Supply, drainage, fixtures, and water heating.

1 to fix
5 passed
Visible Leaks
Passed

Check under every sink, around toilets, water heater pan, exposed supply lines.

5 photos attached
Water Pressure
Passed

Measure static pressure at hose bib (normal 40-80 PSI).

6 photos attached
Toilets
Builder to Fix

Master bath toilet rocks slightly when sat on; wax ring likely requires reset. Builder-covered year-one item.

4 photos attached• Warranty-covered fix
Exterior Hose Bibs
Passed

Operate each bib, check for leaks, vacuum breakers installed.

3 photos attached
Water Heater
Passed

Inspect age, capacity, TPR valve, drain pan, strapping, expansion tank.

4 photos attached
Shut-off Valves
Passed

Locate and verify operation of main shut-off and fixture valves.

6 photos attached

Electrical

Service panel, outlets, switches, lighting, and safety devices.

6 passed
Service Panel
Passed

Inspect breakers, labeling, wire condition, double-taps, proper torque.

3 photos attached
Outlets (Sample Test)
Passed

Test outlets for proper wiring, polarity, grounding.

7 photos attached
GFCI / AFCI Protection
Passed

Verify kitchen, bath, exterior, garage, laundry, dishwasher all properly protected.

6 photos attached
Visible Wiring
Passed

Check accessible runs in attic, garage, mechanical spaces for damage.

6 photos attached
Switches & Fixtures
Passed

Operate light switches, fans, outlets for proper function.

4 photos attached
Smoke & CO Detectors
Passed

Test each detector, verify placement per code.

4 photos attached

Drywall & Interior Finish

Walls, ceilings, texture, paint, and trim.

2 to fix
4 passed
Nail / Screw Pops
Builder to Fix

Seven (7) nail pops identified across living room ceiling and hallway. Normal settlement; builder touch-up included in warranty.

7 photos attached• Warranty-covered fix
Seam & Butt Joint Cracks
Builder to Fix

Hairline cracks at two seams in second bedroom ceiling. Patch & repaint required.

6 photos attached• Warranty-covered fix
Corner Bead
Passed

Inspect inside/outside corners for chipping or separation.

6 photos attached
Ceiling Cracks
Passed

Scan for stress cracks at truss/rafter locations.

3 photos attached
Texture Consistency
Passed

Note inconsistent texture from patch or touch-up work.

3 photos attached
Paint Touch-ups Needed
Passed

Log spots where paint requires builder touch-up.

4 photos attached

Grading & Drainage

Site drainage away from foundation and erosion control.

1 to fix
5 passed
Grade Slope Away from Home
Passed

Verify 6-inch drop over first 10 feet from foundation per code.

5 photos attached
Yard Drainage Pattern
Passed

Observe water paths, French drain/swale effectiveness.

6 photos attached
Downspout Extensions
Builder to Fix

Northeast and southwest downspouts lack extensions. Recommend builder install to prevent erosion near foundation.

6 photos attached• Warranty-covered fix
Landscape Proximity
Passed

Check mulch depth near siding and plant root clearance from foundation.

3 photos attached
Settled Areas
Passed

Identify low spots/sinks that have developed during year 1.

5 photos attached
Erosion Signs
Passed

Document any washout or uncovered landscape fabric.

4 photos attached

Windows & Doors

Fenestration operation, weather-tightness, and security.

6 passed
Weatherstripping
Passed

Inspect all exterior door and window seals for gaps.

5 photos attached
Operation & Locks
Passed

Open/close every window and door; verify locks engage.

4 photos attached
Glazing & IG Seals
Passed

Check for condensation between panes, broken seals.

6 photos attached
Alignment & Hinges
Passed

Observe for rubbing, drag, or settling from shifting frames.

4 photos attached
Screens
Passed

Verify all window screens present and undamaged.

5 photos attached
Threshold Caulking
Passed

Inspect caulking beneath exterior doors for continuity.

6 photos attached

Attic & Insulation

Roof structure view, insulation, ventilation.

6 passed
Insulation Levels (R-Value)
Passed

Measure depth; report if below code (typically R-30+ in FL).

5 photos attached
Ventilation Balance
Passed

Verify intake (soffit) and exhaust (ridge/gable) in proper ratio.

7 photos attached
Roof Deck Condition
Passed

Look for staining, wet spots, daylight through sheathing.

3 photos attached
Penetrations Sealed
Passed

Confirm plumbing stacks, electrical, HVAC duct boots sealed at ceiling.

4 photos attached
Truss / Rafter Condition
Passed

Inspect framing for damage, cracks, missing hangers.

5 photos attached
Moisture / Mold Signs
Passed

Scan for staining, rust on fasteners, or visible mold.

6 photos attached

Foundation & Slab

Slab, stem wall, and visible foundation condition.

6 passed
Foundation Cracks
Passed

Document all hairline and larger cracks; assess structural significance.

7 photos attached
Settlement Signs
Passed

Observe for uneven door/window frames indicating shift.

5 photos attached
Slab Moisture
Passed

Check for efflorescence, dampness, or staining along slab perimeter.

6 photos attached
Post-Tension Cable Evidence
Passed

If applicable, verify no cable breaks or anchor issues.

4 photos attached
Garage Floor Slab
Passed

Inspect for cracks, settling, proper slope to door.

4 photos attached
Perimeter Walk
Passed

Full walk-around documenting stem wall and weep hole condition.

3 photos attached

Interior Finishes

Flooring, cabinets, countertops, and trim quality.

6 passed
Flooring Transitions
Passed

Inspect tile, wood, carpet for gaps, lippage, loose planks.

7 photos attached
Trim & Moldings
Passed

Check baseboards, crown, casings for gaps and caulking.

4 photos attached
Cabinet Alignment
Passed

Open all doors/drawers; verify alignment, no rubbing.

7 photos attached
Countertops
Passed

Inspect for chips, cracks, improper seams.

7 photos attached
Tile & Grout
Passed

Check for cracked tiles, missing grout, sealant around tubs/showers.

6 photos attached
Door Hardware & Closers
Passed

Operate all interior doors; verify latch, hinges, no rubbing.

7 photos attached

Garage & Storage

Garage door, opener, fire-rated assemblies.

6 passed
Garage Door Operation
Passed

Test opening/closing, balance, and auto-reverse safety.

4 photos attached
Opener & Sensors
Passed

Test photo-eye sensors, remote/keypad, light bulb operation.

3 photos attached
Fire-Rated Wall/Ceiling
Passed

Verify 5/8-inch fire-rated drywall on shared walls per code.

7 photos attached
Slab Condition
Passed

Inspect for cracks, settling, proper slope to door.

4 photos attached
Utility Connections
Passed

Examine electrical outlets, hose bib, water heater if in garage.

4 photos attached
Storage Areas & Shelving
Passed

Inspect built-in storage for secure anchoring.

5 photos attached

Builder Letter (Ready to Send)

We've drafted this professional letter for you. Copy and send to your builder's warranty department.

July 19, 2026 Sample Builder Company [Builder Address] Re: 11-Month Warranty Inspection Findings - 1234 Oakwood Drive, Port St. Lucie, FL 34987 Warranty Expiration: May 15, 2026 Report Reference: WI-2026-0412 Dear Warranty Department, As the homeowner at 1234 Oakwood Drive, Port St. Lucie, FL 34987, I am submitting this formal request for warranty coverage of the items documented below. These were identified during a professional 11-month warranty inspection conducted by Calvin Wilson, FL License HI#12345 of Vcita Home Inspection & Service LLC, and fall within the scope of the one-year builder warranty. The following items require repair or attention under warranty: 1. Roofing & Gutters - Gutters & Downspouts Northwest downspout lacks splash block or extension; water is discharging directly at foundation wall. Recommend adding 4' extension or splash block. 2. Stucco & Exterior Walls - Stucco Cracks & Spalling Hairline vertical crack approximately 18" long observed above garage window (east elevation). Cosmetic, but should be sealed and touched up by builder. 3. HVAC System - Condensate Drain Line Secondary condensate line terminates above attic platform without overflow pan drain. Recommend builder install approved drain connection per code. 4. Plumbing - Toilets Master bath toilet rocks slightly when sat on; wax ring likely requires reset. Builder-covered year-one item. 5. Drywall & Interior Finish - Nail / Screw Pops Seven (7) nail pops identified across living room ceiling and hallway. Normal settlement; builder touch-up included in warranty. 6. Drywall & Interior Finish - Seam & Butt Joint Cracks Hairline cracks at two seams in second bedroom ceiling. Patch & repaint required. 7. Grading & Drainage - Downspout Extensions Northeast and southwest downspouts lack extensions. Recommend builder install to prevent erosion near foundation. The complete inspection report, including dated photographs of each finding, is attached and also available via secure digital link. Please review and respond with your repair schedule within ten (10) business days so that work can be completed before the warranty expiration date noted above. Thank you for your prompt attention. Sincerely, Sarah & Michael Johnson 1234 Oakwood Drive, Port St. Lucie, FL 34987
CW
Calvin Wilson
Florida Licensed Home Inspector • HI#12345
Vcita Home Inspection & Service LLC
(772) 224-5655
Insured $1M E&O + GL

Ready for the real thing?

Your actual report will follow the exact same format, with photos of your home and our findings specific to your property.

Ask Vision AI · 🌐 Español | Kreyòl | Việt